Our pool people built framework out of wood panels and some sort of foam to pour the concrete into. After the concrete was poured they took the frame away so now we have grey, rectangle hole with some edging around it plus a vertical section at the far side for the waterfall feature wall. Mr Sasanqua had to go to the site everyday for the first 10 days to water the concrete so that it won't dry too quickly and crack.