Wednesday, 15 August 2012

Met with electrician on site #3

I was asked to come on site again to confirm the positioning and height of our front foyer wall lighting, and this time saw a lot of cables criss-crossing in wall and ceiling cavities throughout the house already. The frames for switchplates are installed on the wall, as well as frames for powerpoint faceplates, and I could almost visualise the inside of our new house and how we would place our furniture.

No comments:

Post a Comment